DECISION No. 146/2004/QD-TTg OF AUGUTST
13,2004 ON MAJOR ORIENTATIONS FOR SOCIO-ECONOMIC DEVELOPMENT
OF THE SOUTHERN KEY ECONOMIC REGION TILL 2010, WITH A VISION
TO 2020
THE PRIME MINISTER
Pursuant to the December 25, 2001 Law on Organization
of the Government;
At the proposal of the Minister of Planning
and Investment in Official Dispatch No. 7349/BKH-CLPT of December
1, 2003,
DECIDES:
Article 1: To approve major orientations
for socio-economic development of the southern key economic
region till 2010, with 2020 vision, for seven provinces and
centrally –run cities being Ho Chi Minh city and Dong Nai,
Ba Ria-Vung Tau, Binh Duong, Tay Ninh, Binh Phuoc and Long
An provinces, aiming to bring into full play the potentials,
geographical advantages, natural conditions and infrastructure
system in order to build the southern key economic region
into one of the dynamic economic development regions with
high and sustainable economic growth rate, an actual economic
motive force of the country, which plays a decisive role in
the national economic growth, takes the lead in the national
industrialization and modernization as well as in some important
fields, contributes to raising the quality, efficiency and
international competitiveness, takes the lead in the international
economic integration and creates a momentum for the development
of Eastern South Vietnam.
Article 2: Major development targets
1. The annual average GDP growth rate in the 2006-2010 period
shall be around 1.2 times and in the 2011-2020 period, around
1.1 times the national annual growth rate. To raise the region’s
contributions to the national GDP from 36% at present to 40-41%
by 2010 and 43-44% by 2020.
2. To increase the per-capita annual average export value
from USD 1,493 in 2005 to USD 3,620 by 2010 and USD 22,310
by 2020.
3. To raise the region’s contributions to the whole country’s
budget revenues from 33.9% in 2005 to 38.7% by 2010 and 40.5%
by 2020.
4. To speed up technological renovation, striving to reach
the average rate of 20-25%/year during the modernization process
and gradually increase the proportion of trained laborers
to over 50% by 2010.
5. To form high-quality production and social service centers
of international and Southeast Asian levels, thus meeting
the demands of the whole southern region and foreigners.
6. To strive to reduce the poor household rate to below 4%
by 2010 and below 1% by 2020 and the unemployment rate to
about 4% by 2020.
7. To stabilize the region’s population at about 15-16 million
by 2020. To ensure social disciplines, order and safety, firmly
maintain security and national defense as well as environmental
sustainability in both urban and rural areas.
Article 3: Tasks and major solutions to
boost the development of key branches and domains
1. News tasks of breakthrough nature
To build a general urban center in the west-northwestern
area of Ho Chi Minh city, which covers the provinces of Long
An and Tay Ninh and Ho Chi Minh city. To develop a high-quality
training center in Binh Duong province, high-quality medical
centers and high-level job training centers in Ba Ria-Vung
Tau province, industrial nursery (specialized in research
into technical and technological innovations for the whole
southern region) and to build a general entrepot in Dong Nai
province.
To build expressways from Ho Chi Minh city to Vung Tau, Trung
Luong and Tay Ninh; and at the same time, to prepare for the
construction of Long Thanh airport.
2. On planning adjustment
a) To speed up the economic restructing along the direction
of developing branches with high-quality goods, modern technologies
and high productivity.
- Services should be developed at high speed and with high
quality with a view to ensuring high growth rate as well as
comprehensive and sustainable development for the whole region.
To concentrate efforts on the comprehensive development of
high-quality services, especially financial and banking services,
tourism , recreation and entertainment, technological services,
telecommunications, international transport; to develop real
estates market, capital market and securities market; to efficiently
promote financial organizations as well as training, medical
service, and scientific research agencies of national, regional
and international calibers.
To build Ho Chi Minh city into a high-quality service center
of international caliber of the whole country, regarding telecommunications,
transport services, finance, banking and tourism.
Trade should trive to catch up with international level and
become a driving force for the development of the whole southern
region.
To bring into full play the advantages of the seaport system,
boosting domestic and international sea transport services,
striving to handle 30-40% of the region’s import/export volume.
To develop the shipping fleet along the direction of developing
special-use ships of high tonnage. To boos international maritime
services in Saigon, Thi Vai and Vung Tau ports.
To diversify post and telecommunications services, to expand
post and telecommunications activities of various economic
sectors in the region, especially the provision of international
post and telecommunications services. To expand the system
of post and telecommunications in rural areas and islands,
ensuring that a post office in big cities shall render services
for between 20,000 and 28,000 people, in small cities, between
14,000 and 18,000 people and in rural areas, between 4,000
and 5,000 people.
To develop tourism in combination with the protection and
restoration of historical and cultural relics and nature conservation
regions. To attach importance to the development of key tourists
routes. To link tourism in provinces and cities in the region
with tourism in other regions of the country. To raise the
quality and diversify the forms of tourism, boost the development
of tourist information and development consultancy centers
in combination with the formulation of a system of tourism
security and safety, so as to receive around 10 million tours
of people, including 2 million international arrivals, to
the southeastern region by 2005; and around 13-14 million
by 2010, including 3.2 – 3.5 million foreign tourists.
- To speed up hi-tech industries, clean industries and supporting
industries.
To give priority to the development of spearhead industries
of high intellectual and technological contents (informatics,
telecommunications, new material technology, micro-biological
technology, clean industries and basic industries, which shall
serve as foundation for the general development and international
integration and act as the core in accelerating the industrialization
and modernization process in the region and surrounding areas.
At the same time, to develop supporting industries so as to
increase localization rates, in combination with the manufacture
of accessories and auxiliary products, repair and maintenance…
To promote the role of small-and medium sized enterprises,
along the direction of embarking immediately on modern technologies
in parallel with environmental protection.
To boost the development of some key industries such as oil
and gas exploitation; electronics and software production;
machine tool engineering; electricity, fertilizer and chemical
production from oil and gas, agricultural, forestry, aquatic
and foodstuff processing; textile and garment industry, footwear,
plastics; building materials industry. To raise the proportion
of manufacturing industries.
To adjust the arrangement of industries in the region on
the basis of exploiting natural resources and geographical
positions of underdeveloped provinces such as Long An, Binh
Phuoc and Tay Ninh (with low industrial production density),
suitable to the characteristics of each industry.
In order to speed up large-scale development, priority should
be given to the development of electronics and informatics
which shall serve as premise for the development of other
domains. The priority development direction is to embark straight
on modern technologies and take advantages of being the successor.
To bring into full ply the region’s labor potential in order
to boost international cooperation, aiming to tap capital
sources and new technologies. To strive for the target that
by 2010, electronics and informatics shall become spearhead
export oriented industries, step by step developing synchronously
both hardware and software, with priority to be given to software
development. To make the southern key economic region a strong
center in electronic accessories production, software, telecommunications
and informatics in Southeast Asia. To promote investment in
hi-tech and software-production industrial park in Ho Chi
Minh city. To strive to raise software production value to
around VND 1,800 billion by 2005 (roughly USD 150-160 million).
- To boost the commodity agricultural production in service
of industrial consumption demands in urban centers as well
as export.
To develop intensive farming in order to create raw materials
for the development of processing industries in localities
and industrial parks, thus constantly increasing the domestic
added value in export farm produce. To build areas for production
of export farm produce (rubber, coffee, pepper, cashew), including:
Rubber tree-growing areas shall concentrate mainly in Binh
Phuoc, Dong Nai (Thong Nhat, Long Thanh, Xuan Loc and Long
Khanh communes), Ba Ria-Vung Tau (Xuyen Moc, Tan Thanh and
Chau Duc communes) and Cu Chi (Ho Chi Minh city).
Coffee-growing areas shall be in Dong Nai and Ba Ria-Vung
Tau. Pepper-growing areas shall concentrate in Xuan Loc and
Long Khanh rural districts, Dong Nai province; and Chau Duc
rural district, Ba Ria-Vung Tau province. The cashew areas
shall be in Long Thanh and Long Khanh rural districts, Dong
Nai province; Chau Duc rural district, Ba Ria-Vung Tau province,
and rural districts of Binh Phuoc province. The vegetable
growing areas shall concentrate in Ho Chi Minh city and Tan
Thanh, Long Dat rural districts, Ba Ria-Vung Tau province,
and Bien Hoa city, Dong Nai province.
Areas under fruit trees shall be in Lai Thieu (Binh Duong
province); grape-fruit in Tan Trieu and Bien Hoa city; banana
and durian in Long Khanh rural district (Dong Nai province)
and longan and custard-apple (Ba Ria –Vung Tau province).
To raise the green coverage percentage,, create the “green
lung” for urban centers and industrial parks, improve ecological
environment and create landscapes for tourism, use land rationally
and plant more perennial trees on forest land. To protect
headwaters forests, increase and soon stabilize coastal protective
forests, especially the submerged forests in Can Gio rural
district of Ho Chi Minh city and along the coast of Ba Ria-Vung
Tau province, paper raw material forests and South Cat Tien
national park of Dong Nai province. To regreen waste land
and bare hills in Tay Ninh, Ba Ria-Vung Tau, Dong Nai, Binh
Duong and Binh Phuoc province in combination with afforestation
programs so as to form resorts for ecological tourism and
convalescence.
To concentrate investment in offshore fishing means along
the direction of replacing the 100-200 CV ships’ wooden shells
with those of new materials, ensuring their durability and
saving timber. To build a port system, dredge channels and
develop fisheries service establishments in Con Dao, Ba Ria-Vung
Tau province.
To develop intensive shrimp farming and freshwater-fish farming
in irrigation works. To boost aquatic product processing,
upgrade and modernize export-processing establishments in
Ho Chi Minh city, Ba Ria –Vung Tau and Dong Nai provinces.
b) To ensure the balanced development with economic and social
infrastructure system taking the lead.
- On economic infrastructure system.
To compile the upgrading of national highways 50, 20, 22b,
Route N2…linking the southern key economic region to the Mekong
river delta and the Central Highlands and work out plans on
the formulation of new linking routes.
To soon invest in expressway from Ho Chi Minh city to Can
Tho province, which is an important traffic axis ensuring
the exchanges between Eastern South Vietnam and the Mekong
river delta.
To make investment in the construction of Ho Chi Minh city
– Long Thanh – Vung Tau expressway, which is also the route
linking Ho Chi Minh city to Long Thanh international airport.
By 2005, to complete the construction of Long Thanh – Ho Chi
Minh city section with 4 lanes. In the 2006-2010 period, to
continue building Long Thanh – Vung Tau section. To upgrade
the National Highway 13, with the 4-lane 30km-section from
Binh Phuoc crossroad to Thu Dau Mot expected to be completed
by 2005.
To continue upgrade, the proceed to modernize the traffic
system in urban centers in the region. To work out plan on
perfecting the traffic network of Ho Chi Minh city, attaching
special importance to the planning of, and investment in,
the development of mass transit, researching into the construction
of system of bridges spanning rivers, overhead or underground
tramways. To plan the traffic development in combination with
the planning on construction of civilized urban centers (not
permitting the unplanned construction along roads).
To complete the modernization of Tan Son Nhat international
airport in Long Thanh in order to share burdens with Tan Son
Nhat airport when the latter is overloaded. To research into
the renovation of Co Ong airport in Con Dao in service of
tourism and socio-economic development of the island. The
construction thereof shall be based on the general efficiency
of Con Dao’s development.
In the immediate future, it is necessary to efficiently use
ports in Ho Chi MInh city area, including Saigon port and
a series of ports and wharves of ministries, branches, localities,
joint ventures… along Saigon River and Nha Be, at the same
time, to build a suitable tempo ports in Cat Lai and Hiep
Phuoc areas.
In furtherance of the Polibureau’s Resolution No. 20-NQ/TW
of November 18,2002 on the development of Ho Chi Minh city
up to 2010, to sonn finalize plans on relocating the system
of ports along Sai Gon river out of the inner city in a rational
and strict manner and at a suitable tempo so as to avoid congestion
and wastefulness caused by the relocation process and minimize
adverse impacts on production, business, national defense
and security . to step by step invest in the construction
of Cai Mep and Thi Vai port clusters, which are the trans-Asia
road’s gateway to the sea, so as to satisfy the transport
demand of the whole southern region.
To build general entrepots in order to meet the increasing
development requirement of whole region. To research into
the construction of general entrepots at places where cargoes
can be conveniently and quickly rallied from seaports and
transported to different areas.
To perfect, renovate and upgrade routes linking to the Mekong
river delta, including two important routes: Saigon –Ca Mau
city and Saigon – Kien Luong, which shall be funded with ODA
capital.
In the 2004, 2005 period, it is necessary to renovate the
railway terminals of Ho Chi Minh city, in the 2006-2010 period,
to reaserch into the construction of raiway route from Ho
Chi Minh city to Vung Tau, build a railway system linking
the seaport system with industrial parks along the corridor
of National Highway 51, the roads from Ho Chi Minh city to
Phnom Penh, the Mekong river delta and the Central Hihglands
according to planning.
To upgrade water-supply and drainage works, step by step
develop the water-supply system according to region’s and
zone’s plannings, along the direction of being modern and
on a par with the technological and managerial standards of
civilized and advanced urban centers in the region and the
world. To renovate the water drainage and waste water treatment
system, putting an end to the situation of waterlogging in
urban centers, especially Ho Chi Minh city.
When building plants and industrial parks, waste-treatment
works must be constructed simultaneously so as not to cause
environmental pollution. To plan and build the systems for
treatment of urban garbage and industrial parks wastes, ensuring
green, clean and fine environment in urban centers.
In the 2006-2010 period, to invest in the construction of
40km-long 500KV-transmission line and a 500KV transformer
of a capacity of 450 MVA, 181 km-long transmission line of
110 KV and 105 transformers of 110 KV with a total capacity
of 4,100 MVA>
- On social infrastructure system.
To build cultural centers so as to restore and put traditional
culture activities into order. To invest in and upgrade the
existing television towers in the region so as to raise the
quality of television broadcasting.
To develop medical establishments, equipment, facilities
and services so as to meet the diversified demands of not
only local people but also of foreigners working in joint
ventures and tourists. To build high-quality medical centers
with advanced and modern medical equipment and facilities,
avoiding the concentration thereof in Ho Chi Minh city. To
rearrange and enhance medical networks in communes, wards
and communities, ensuring that 100% villages and communes
have medical workers and 100% grassroots and communal health
stations have medical doctors.
c) On the development of urban centers and industrial parks.
- To develop satellite urban centers around big cities, which
are linked with industrial parks, thus forming urban clusters
of large scale. To form new urban centers with a population
of between 700,000 and 1,000,000 in Phu My, Long Son, Long
Hai (Ba Ria-Vung Tau), Di An-Tan Uyen (Binh Duong), Tam Phuoc,
Nhon Trach (Dong Nai). To build a new urban center of about
6,000 ha in the area overlapping Ho Chi Minh city, Long An
and Tay Ninh provinces (Duc Hoa, Trang Bang and Cu Chi rural
districts). For other big urban centers, to renovate, embellish
and modernize the inner areas in parallel with investing in
the synchronous infrastructure development.
To plan and renovate rural areas in combination with formation
of peripheral urban centers, expanded district townships and
urban centers which are linked to industrial parks; district
townships and towns shall be upgraded and further built.
To develop industrial parks and hi-tech parks, to research
into the scheme on construction of industrial nursery in the
periphery of Ho Chi Minh city, near scientific research centers
and hi-tech parks, which shall perform the tasks of renovating
techniques and technologies for factories in the South.
To commission hi-tech parks. To encourage investment in industrial
parks and export processing regions, which have been granted
licenses. To revise planning on industrial parks in the whole
region so as to ensure sustainable and balanced development,
of which Ho Chi Minh city’s industrial parks shall be built
along the direction of hi-tech industrial parks, raising the
gray matter contents in industrial products. To attach importance
to the construction of infrastructure outside industrial pakrs’fence
such as dwelling house, hospitals, schools, job-training centers,
trade centers, entertainment and recreation areas… To work
out detailed planning and plans on the construction of residential
quarters in combination with industrial parks so as to ensure
living conditions for those who come from other places to
work.
d) To renew mechanism on domestic and foreign investment
attraction.
To formulate synchronous mechanism and policies to attract
domestic and foreign investment capital , working out policies
to mobilize capital for investment in high-quality services
and hi-tech industries, policies on export promotion, policies
on employment of cadres, and suitable and flexible mechanism
for decentralization between the central and local administrations,
…so as to make the coordination among branches, localities
and between branches and localities close and effective, thus
creating favorable environment for attraction of investment
capital, and being capable of competing with regional countries.
To adjust the investment structure along the direction of
raising efficiency and competitiveness, forming projects of
national, regional and local (provincial and municipal) levels,
which are managed according to uniform standards; to exploit
resources, especially internal resources, and at the same
time, create conditions for attracting capital and technologies
from outside in order to raise the efficiency and competitiveness
of the economy, in conformity with the development planning
and economic restructuring.
The above-mentioned investment capital sources shall be firstly
given to the development of high-scientific content industries
using modern technologies.
Article 4: Human resource training.
To train human resources, especially high-quality human resources,
in order to meet the development demand of the region, the
southern region and the whole country. To invest in the development
of human resources, especially human resources in production
domains and spearhead branches (electronics, software, production,
informatics and automation…). To expand the scope of human
resource training in various forms, with attention being paid
to the training of skilled workers so as to meet the industrialization
and modernization requirements. To combine the training of
human resources in the central area and suburban areas, in
the southern key economic region and other areas so as to
attract the labor force outside the area to participate in
economic activities therein.
To rearrange the system of training establishments (universities,
colleges and job training schools), attaching importance to
the training of economic and technical majors in service of
modern and hi-tech development. To invest in, raise the quality
of, and expand training forms of, universities in Ho Chi Minh
city and surrounding provinces, taking into account the demands
of the Mekong river delta and the Central Highlands.
To build high-quality training centers and job training centers
in Dong Nai province and work out plans on setting up join
ventures with foreign parties.
To research into the construction of scientific research
and technology transfer centers of national, regional and
international calibre for the whole region , which shall be
located near Ho Chi Minh city’s hi-tech parks.
Article 5: The ministers, the heads of the ministerial-level
agencies, the heads of the agencies attached to the Government,
and the presidents of the People’s Committees of provinces
and centrally – run cities in the southern key economic region
shall have to closely inspect and monitor the implementation
of the orientations on socio-economic development of the southern
key economic region and formulate suitable five – year and
annual investment development programs and projects.
The Coordiation Board for development of key economic regions
shall direct the Ministry of Planning and Investment in coordinating
with concerned ministries, branches and People’s Committees
in revising development plannings of the whole region in a
practical and efficient manner. First of all, to concentrate
efforts on revising the overall planning on socio-economic
development of the whole key economic region, especially the
overall plannings on development of urban centers, economic
corridors, industrial parks, seaport system…. To revise socio
economic development planning of various provinces in order
to adjust them to suit the new development situation. After
revising the overall plannings, branches and localities should
soon realize detailed plannings, ensuring the timely notification
thereof to grassroots units and people.
The Ministry of Planning and Investment shall assume the
prime responsibility for, and coordinate with the concerned
ministries, branches and localities in, implementing key investment
programs and projects.
The ministries and central branches shall have to coordinate
with, and assist provinces and centrally-run cities in the
southern key economic region in the course of revising and
implementing set programs and projects, ensuring the consistence
between each province’s and city’s planning and the plannings
of the region and the whole country.
Article 6. This Decision takes effect 15 days after its publication
in the official Gazette and replaces the Prime Minister’s
Decision No. 44/1998/QD-TTg of February 23, 1998 approving
the master planning on socio-economic region from now still
2010.
Article 7. The presidents of the People’s Committee of provinces
and centrally-run cities in the southern key economic region,
the ministers, the heads of the ministerial-level agencies,
and the heads of the agencies attached to the Government shall
have to implement this Decision.
Prime Minister
PHAN VAN KHAI
|