CHAN MAY PORT |
1.
Port's name & contact address: |
Port's name:
CHAN MAY
PORT
Uder: Shipbuilding Industry Corp. – SBIC
Port's location: 16°20'00"N - 108°00'00"E
Pilot boarding position: 16°21'17"N - 108°00'00"E
Address: Loc Vinh commune, Phu Loc district, Thua Thien Hue province
Tels. No.: (84.54) 3876096
Fax No.: (84.54) 3891838
E-mail: info@chanmayport.com.vn
Website: www.chanmayport.com.vn |
|
2. Management |
General Director |
Nguyen Huu Tho
Tel: (84.54) 3891839 |
Vice Director, Ops & Engineering |
Huynh Van Toan
Tel: (84.54) 6217160 |
Vice Director |
Tran Van Phong
Tel: (84.54) 6217161 |
Vice Director |
Nguyen Thanh Cong
Tel: (84.54) 3676488 |
|
3.
Access channel:
Length 2.7 km. Channel depth: -12 m. Tidal regime: irregular semi-diurnal. Average tidal range: 0.4 m. Maximum draft: 11 m.
Maximum size of vessel accepted: 50,000 DWT |
4. Infrastructure
and equipment: |
.
Berth facilities:
Name/No. |
Length |
Depth alongside |
Vessel/Cargo |
- Berth.1, jetty
- Temporary wharf |
300 m
120 m
|
-12.5 m
-06.0m |
50,000DWT cargo vessel, passenger ship
3,200DWT vessel |
|
. Storage facilities:
Total port area: 82.000 m2, of which:
Warehouse/shed: 2000 m2. Open storage: 80,000 m2, of which yard for stacking cont.: 10,000 m2.
Total storage capacity: 200,000 MT.
. Major equipment:
|
Type |
No. |
Capacity |
Habour mobile crane |
1 |
63 MT |
Rubber-tyred crane |
1 |
30
MT |
Crawler crane |
3 |
50~80 MT |
Lift truck |
4 |
3~5 MT |
Tractor with chassis |
2 |
45 MT |
Tug boat |
2 |
1,020HP/1,800HP |
Excavator |
3 |
1~3 m3 |
Bulldozer |
1 |
|
Generator |
2 |
5~100KW |
|
5. Cargo throughput:
|
|
|
2010 |
2011 |
2012 |
2013 |
2014 |
2015 |
Total |
1,350.000 MT |
1,700.000 MT |
1,580.000 MT |
1,550.000 MT |
1,785.000 MT |
2,172.000 MT |
Import |
25,000 MT |
52,000 MT |
32,000 MT |
42,000 MT |
61,000 MT |
94,500 MT |
Export |
900,000 MT |
1,228,000 MT |
1,238,000 MT |
1,270,000 MT |
1,209,000 MT |
1,274,000 MT |
Domestic |
425,000 MT |
420,000 MT |
310,000 MT |
238,000 MT |
515,000 MT |
803,500 MT |
Ship calls |
280 |
260 |
199 |
176 |
254 |
417 |
|
|
|
6. Development
Plans |
Projects |
Investment capital |
Implementation |
Construction of berth No.2 |
VND 865 billion |
Being implemented |
Dredging of water-front berth channel |
VND 5.5 billion |
Being implemented |
Upgrading of Berth No.1 |
VND 86.5 billion |
Planned to be completed by 15 June 2015 |
Construction of drainage system |
VND 1 billion |
Being implemented |
|
7. Main services
Cargo handling, transporting, tallying, and warehousing. Warehouse and yard rental. Tug assistance. Shipchandlers. Shipping agency and brokerage. Mechanic repairs. Im/export and maritime services |
8. Computer system
62 PCs with LAN system, applied in port operartions and management
|
|