B12 OIL TERMINAL |
1.
Port's name & contact address: |
Port's name: B12 OIL TERMINAL
Under:
B12 Petroleum Company – Vietnam National Petroleum Corp.
Port's location:
20°57'54"N - 103°03'17"E Pilot boarding
position: 20°43' 04"N - 107°10' 03"E
Address: Quarter 1, Bai Chay, Quang Ninh Pro.
Tels. No.: 84.33.3846360 / 3846689
Fax No.: 84.33.3847091
Email: B12oilterm@petrolimex.com.vn / B12oilterm@yahoo.com
Website: http://www.b12petroleum.com.vn |
Mr. Phạm Minh Dực
|
2. Management |
Director |
Mr. Pham Minh Duc
Tel: (84.33) 3846689
|
Vice Director |
Mr. Nguyen Viet Cuong
Tel: (84.33) 3845662 |
Vice Director |
Mr. Nguyen Thanh Son
Tel: (84.33)3845663; (84) 912.191587 |
|
3.
Access channel:
- Lenght: 30 km. Channel depth: -9.7m
- Tidal regime: regular diurnal.
- Average tidal range: 3.7m
- Maximum draft: -13,0m.
- Maximum size of vessel accepted: 40,000 DWT
|
4. Infrastructure
and equipment: |
.Berth facilities:
Name/No. |
Length |
Depth alongside |
Vessel/Cargo |
Loading jetty - 500DWT
Loading/unloading jetty – 5,000 DWT
Unloading jetty – 40,000 DWT |
106 m
130 m
245 m |
-2.1 m
-6.5 m
-13.0 m |
Diesel, kerosene, fuel oil
Petroleum in all kinds
Petroleum in all kinds |
|
. Storage facilities:
Total warehousing area: 5.6 ha
Tank storage area: 2.3 ha.
12 tanks of 90,000m3 for storing petroleum.
. Major equipment: |
Type |
No. |
Capacity |
Loading arms – 10” |
5 |
|
Loading arms – 6” |
4 |
400m3/hour/each |
Pipeline system 4” |
5 |
|
Oil pump |
8 |
|
Pipe line system |
1 |
|
Tug boat |
2 |
|
High-speed craft |
1 |
40HP |
Self-propeller barge |
3 |
|
Service boat |
2 |
|
|
5. Cargo throughput: |
|
2010 |
2011 |
2012 |
2013 |
2014 |
2015 |
Total |
4,337,938
M3/MT xăng dầu.
|
4,250,000 M3 /MT xăng dầu |
4,024,982 M3
xăng dầu |
3,613,212 M3/MT |
3,552,000 M3 /MT |
3,552,000 M3 /MT |
Export |
2,712,106 M3 |
2,612,304 M3 |
2,612,304 M3/MT |
|
|
2,694,677 m3 |
Import |
0 |
0 |
2,679,944 M3 |
3,613,212 M3/MT |
3,552,000 M3/MT |
3,775,757 M3/MT |
Domestic |
1,625,832 M3/MT |
1,637,696 M3/MT |
1,345,038 M3 |
|
|
|
Ship calls |
3,639 |
140 |
126 |
112 |
127 |
136 |
|
|
6. Development
Plans |
Project |
Total cost of investment |
Implementation |
Repairing and upgradingg of port facilities and equipments |
VND 7 million |
2015 |
|
|
7. Main services:
Handling all kind of tankers at port. Tug assistances and maritime salvage. Rescuing against oil-spills. Ship chandlers. Maintenance and repairs of vessel equipments. Wholesale, retail by waterway transport of petroleum. Washing and treatment of oil-contaminated water
|
8. Computer system:
48 PCs including 4 server with LAN linked, being applied in trade management and operations specialized in automation systems, petroleum loading/unloading, tank testing, billing
|
|