QUANG NINH PORT |
1.
Port's name & contact address: |
- Port’s name:
QUẢNG NINH PORT J.S. CO.
- Under: Vietnam National Shipping Lines
- Ports location: 20o02’35”E
- Pilot boarding position: 20o43’04”N – 107o10’33”E
- Địa chỉ: 1 Cái Lân str, Bãi Cháy ward, Hạ Long city, Quảng Ninh Pro.
- Tel: (84.33) 3 825 627
- Fax: (84.33) 3 826 118
- Email: qnp@quangninhport.com.vn
- Website: www.quangninhport.com.vn
|
Mr. BUI QUANG DAO |
2. Management |
General Director |
Mr Bui Quang Dao |
Deputy Director |
Mr Hoang Trong Tung |
Deputy Director |
Mr Quach Dinh Phu |
Deputy Director |
Mr Dinh Anh Tuan |
|
3.
Access channel:
Length:36 km, consisting of 2 sections:
From Buoy 0 to Hon Mot islet: 22,5 km, channel depth: 13m-20m
From Hon Mot to Cai Lan Port: 10,5 km, channel depth: -10m
Tidal regime: diurnal. Average tidal range 3,2m. Maximum size of vessel accepted: 75.000 DWT |
4. Infrastructure
and equipment: |
Name/No. |
Length |
Depth alongside |
Vessel/Cargo |
Wharf No. 1 |
166 m |
-9.0 m
|
Bulk/General cargo
|
Wharves No.5,6,7 |
680 m |
-12.0 m |
Container/General cargo |
Cai Lan sub-wharf |
80 m
|
-5.0 m
|
Coal/Wood log/Construction materials |
|
. Storage facilities:
- Warehouse/shed: 14,200 m2 , of which CFS: 4,600 m2
- Yard: 142,000 m2 trong đo bãi chứa côngten-nơ 49.000m2
. Major equuipment:
|
Type |
No. |
Capacity |
Quayside gantry crane
|
02 |
40 MT |
Harbour mobile crane |
02 |
64 & 100 MT |
Rubber-tyred gantry crane |
04 |
50 MT/5+1 & 7+1 high |
Jib/rubber-tyred crane |
09 |
10 - 40 MT |
MT container lifter |
02 |
7 MT /5 high |
Folklift |
31 |
1.5 - 8 MT |
Tractor |
07 |
|
Container tractor |
11 |
|
Scale |
05 |
65 - 80 MT |
Buldozer, excavator |
18 |
1.25 – 16 m3 |
|
06 |
10m3 |
Tug boat |
02 |
1,260HP & 3,200HP |
|
5. Cargo throughput: |
|
2010 |
2011 |
2012 |
2013 |
2014 |
2015 |
Total |
5,853,000 MT |
7,257,000 MT |
7,184,720 MT |
5.033,735 MT |
6,467,280 MT |
6,332,109 MT |
Import |
1,703,123 MT |
1,918,000 MT |
2,146,368 MT |
1,402,548 MT |
3,269,169 MT. |
3,074,226 MT |
Export |
2,416,986 MT |
3,384,000 MT. |
2,891,517 MT |
2,905,051 MT |
1,871,947 MT |
1,440,636 MT |
Domestic |
1,732,891 MT |
1,955,000 MT |
2,146,835 MT |
726,136 MT |
1,326,164 MT |
1,817,247 MT |
Container |
204,129 TEUs |
260,000 TEUs |
240,580 TEUs |
28,013 TEUs |
3,227 TEUs |
|
Ship calls |
428 |
495 |
472 |
335 |
316 |
391 |
|
|
|
|
6. Development
Plans |
Project |
Total investment |
Implementation |
- Levelling of hill forward up-stream Cai Lan terminal, stage II |
VND 9.7 billion
|
1st & 2nd quarters of 2015 |
- Purchase of 2 hoppers and 2 remote-control grabs |
VND 6 billion |
2nd quarter of 2015 |
- Purchase of 1 bulldozer and 2 excavators |
VND 6 billion |
3rd quarter of 2015 |
- Construction of sub-wharf at down-stream berth No.7 |
VND 30 billion |
|
- Others |
VND 5 billion |
2015 |
|
7. Main services
Cargo handling, tallying and transporting. Warelousing and other maritime services. Agents and retail trade of petroleum. On-land and by-waterway domestic transports
|
8. Computer system
CTMS, GTOS. |
9. Pictures: