North area
> Quang Ninh Port
> Cam Pha Port
> Hai Phong Port
> Cua Cam Port
> Dinh Vu Port
> Vat Cach Port
> Doan Xa Port
> B12 Oil Terminal Port
> Transvina
> PTSC Dinh Vu Port
> Cai Lan International Container Terminal
> Hai Phong - New Port 128
> Nam Hai Dinh Vu
Central area
> Thanh Hoa Port
> Nghe Tinh Port
> Viet - Lao Vung Ang
> Quang Binh Port
> Cua Viet Port
> Thuan An Port
> Chan May Port
> Da Nang Port
> Nguyen Van Troi Port
> Ky Ha Port
> Ky Ha-Quang Nam Port
> Hai Son Port
> Song Han 9 Port
> Qui Nhon Port
> Nha Trang Port
> Thi Nai Port
> Cam Ranh Port
> Vung Ro Port
> Dzung Quat Port
South area
> Binh Minh Port
> Phu My Port
> Dong Nai Port
> Saigon New Port
> Saigon Port
> Ben Nghe Port
> Binh Duong Port
> Tan Thuan Dong Port
> Rau Qua Port
> Saigon Petro Port
> Nha be Oil Port
> Bong Sen Port
> My Tho Port
> Dong Thap Port
> Vinh Long Port
> Can Tho Port
> Ben Dam-Con Dao VT
> Vung Tau Commercial Port
> Tra Noc - Can Tho
> An Giang Port
>

VICT Port

> Can Tho ship industry and transport
> SP-PSA
>

Interflour Cai Mep

> Cai Mep International Terminal
> Saigon premier container terminal (SPCT)
>

Tan Cang - Cai Mep International Terminal (TCIT)

> PVC-MS
> Cai Mep Oil Terminal
> PV Shipyard
> SITV
> Saigon-Hiep Phuoc
> Long Thanh
> Dong Xuyen
> SP-SSA International Terminal- SSIT
> Phu Dong
> Nam Can
> Bao Mai
 
 
 

 


QUANG NINH PORT
1. Port's name & contact address:

  • Port’s name:
  • QUẢNG NINH PORT J.S. CO.
  • Under: Vietnam National Shipping Lines
  • Ports location: 20o02’35”E
  • Pilot boarding position: 20o43’04”N – 107o10’33”E
  • Địa chỉ: 1 Cái Lân str, Bãi Cháy ward, Hạ Long city, Quảng Ninh Pro.
  • Tel: (84.33) 3 825 627
  • Fax: (84.33) 3 826 118
  • Email: qnp@quangninhport.com.vn            
  • Website: www.quangninhport.com.vn


Mr. BUI QUANG DAO
2. Management
General Director Mr Bui Quang Dao
Deputy Director Mr Hoang Trong Tung
Deputy Director Mr Quach Dinh Phu
Deputy Director Mr Dinh Anh Tuan

3. Access channel:

Length:36 km, consisting of 2 sections:
From Buoy 0 to Hon Mot islet: 22,5 km, channel depth: 13m-20m
From Hon Mot to Cai
Lan Port: 10,5 km, channel depth: -10m
Tidal regime: diurnal. Average tidal range 3,2m. Maximum size of vessel accepted: 75.000 DWT

4. Infrastructure and equipment:

Name/No.

Length

Depth alongside

Vessel/Cargo

 

Wharf No. 1

 

    166 m

    

      -9.0 m

 

 

Bulk/General cargo

 

Wharves No.5,6,7

    680 m

    -12.0 m

Container/General cargo

Cai Lan sub-wharf

     80 m

 

      -5.0 m

 

Coal/Wood log/Construction materials


. Storage facilities:

  • Warehouse/shed: 14,200 m2 , of which CFS: 4,600 m2
  • Yard: 142,000 m2 trong đo bãi chứa côngten-nơ 49.000m2


. Major equuipment:

Type
No.
Capacity


Quayside gantry crane                                                                   

02
40 MT

Harbour mobile crane                                     

02
64 & 100 MT

Rubber-tyred gantry crane                                                     

04
 
50 MT/5+1 & 7+1 high
Jib/rubber-tyred crane                                
09
  
10 - 40 MT
MT container lifter
02
7 MT /5 high
Folklift
31
1.5 - 8 MT
Tractor
07
Container tractor 11  
Scale
05
65 - 80 MT
Buldozer, excavator           
  18
1.25 – 16 m3

Bagging hopper                       

06
10m3
Tug boat 02 1,260HP & 3,200HP
5. Cargo throughput:
2010 2011 2012 2013 2014 2015
Total 5,853,000 MT       7,257,000 MT 7,184,720 MT 5.033,735 MT 6,467,280 MT 6,332,109 MT
Import 1,703,123 MT 1,918,000 MT 2,146,368 MT 1,402,548 MT 3,269,169 MT. 3,074,226 MT
Export 2,416,986 MT 3,384,000 MT. 2,891,517 MT 2,905,051 MT 1,871,947 MT 1,440,636 MT
Domestic 1,732,891 MT 1,955,000 MT 2,146,835 MT 726,136 MT 1,326,164 MT 1,817,247 MT
Container 204,129 TEUs 260,000 TEUs 240,580 TEUs 28,013 TEUs 3,227 TEUs  
Ship calls 428 495 472 335 316 391

 
 
6. Development Plans

Project

Total investment

Implementation

- Levelling of hill forward up-stream Cai Lan terminal, stage II

VND 9.7 billion

 

1st & 2nd quarters of 2015

- Purchase of 2 hoppers and 2 remote-control grabs

VND 6 billion

2nd quarter of 2015

- Purchase of 1 bulldozer and 2 excavators

VND 6 billion

3rd quarter of 2015

- Construction of sub-wharf at down-stream berth No.7

VND 30 billion

 

- Others

VND 5 billion

2015

7. Main services

Cargo handling, tallying and transporting. Warelousing and other maritime services. Agents and retail trade of petroleum. On-land and by-waterway domestic transports

8. Computer system

CTMS, GTOS.

9. Pictures: (click to see full images)

 