North area
> Quang Ninh Port
> Cam Pha Port
> Hai Phong Port
> Cua Cam Port
> Dinh Vu Port
> Vat Cach Port
> Doan Xa Port
> B12 Oil Terminal Port
> Transvina
> PTSC Dinh Vu Port
> Cai Lan International Container Terminal
> Hai Phong - New Port 128
> Nam Hai Dinh Vu
Central area
> Thanh Hoa Port
> Nghe Tinh Port
> Viet - Lao Vung Ang
> Quang Binh Port
> Cua Viet Port
> Thuan An Port
> Chan May Port
> Da Nang Port
> Nguyen Van Troi Port
> Ky Ha Port
> Ky Ha-Quang Nam Port
> Hai Son Port
> Song Han 9 Port
> Qui Nhon Port
> Nha Trang Port
> Thi Nai Port
> Cam Ranh Port
> Vung Ro Port
> Dzung Quat Port
South area
> Binh Minh Port
> Phu My Port
> Dong Nai Port
> Saigon New Port
> Saigon Port
> Ben Nghe Port
> Binh Duong Port
> Tan Thuan Dong Port
> Rau Qua Port
> Saigon Petro Port
> Nha be Oil Port
> Bong Sen Port
> My Tho Port
> Dong Thap Port
> Vinh Long Port
> Can Tho Port
> Ben Dam-Con Dao VT
> Vung Tau Commercial Port
> Tra Noc - Can Tho
> An Giang Port
>

VICT Port

> Can Tho ship industry and transport
> SP-PSA
>

Interflour Cai Mep

> Cai Mep International Terminal
> Saigon premier container terminal (SPCT)
>

Tan Cang - Cai Mep International Terminal (TCIT)

> PVC-MS
> Cai Mep Oil Terminal
> PV Shipyard
> SITV
> Saigon-Hiep Phuoc
> Long Thanh
> Dong Xuyen
> SP-SSA International Terminal- SSIT
> Phu Dong
> Nam Can
> Bao Mai
 
 
 


SAIGON
PREMIER CONTAINER TERMINAL

1. Port’s name & contact address:
 

Port's name: SAIGON PREMIER CONTAINER TERMINAL (SPCT)
Under: Joint Venture between DP World and Tan Thuan Industrial
Promotion Company
Port's location: 10°38’15”N - 106°45’51”E
Pilot boarding position: 10°20’24”N – 107°02’00”E
Address: Lot C17, Hiep Phuoc Industrial Zone, Nha Be District, Ho Chi Minh City
Tel: +84 (8) 38734488
Fax: +84 (8) 38734216
Email: info@spct.vn  
Website: www.spct.vn


Mr. William Khoury 

2. Management:  


General Director

Mr. William Khoury     
Tel: +84 (8) 38734488 Ext. 1001

Deputy Director General

Mr. Nguyen Le Chon Tam   
 Tel: (84.8) 38734488 Ext. 1003

3. Access channel:    

Total length:     85 km (Long Tau channel)
Channel depth: -8.5m (CD)    
Tidal regime: Irregular semi-diurnal. Average variation: 2.8m (Tide HHW: 3.6m, LLW: 0.8m).
Air draft (under power cable): 55m
Depth along side : -11.0 m (CD)
Bollard strength: 100 MT
Maximum size of vessel accepted: 50.000 DWT

4. Infrastructure and equipment:  

- Berth facilities:

 Name/No.

Length

Depth alongside

 Vessel/Cargo

VNSPC

 
         500m
      

    
- 11m (CD)

Container / RORO / Break bulk

 

- Storage facilities: Total  area: 24.465 ha - Warehouse/shed:  
 
- Major equipment:

Type

No

Capacity

Quayside gantry cranes                                     

5

65~80 MT

Ruber Tyred Gantry Cranes

13

5+1 high.

Reach stackers

 3

 5 high

Empty container lifter 2 8 MT
Tractor
20
34 MT

5. Cargo throughput:  


2010

2011 2012 2013 2014 2015

Total

1,160,936 MT

1,677,264 MT 2,230,258 MT 2,202,471 MT 2,534,221 MT 2,534,221 MT

Import

438,192 MT

762,012 MT. 520,833 MT 506,469 MT 514,566 MT 388,762 MT

Export

488,748 MT

777,084 MT 868,475 MT 956,284 MT 1,501,335 MT 1,051,562 MT

Domestic

233,996 M

138,168 MT 835,935 MT 730,038 MT 482,918 MT 688,685 MT

Container

95,934 TEUs

  224,139 TEUs 251,035 TEUs 301,382 TEUs 242,369 TEUs

Shipp calls

291

285 366 360 471 415

6. Development plan :    

Projects

Total investment

Implementation

 

7. Main services:    
      Container Handling. RORO operations. BB operations; CFS stuffing/stripping.

8. Computer system:    

      N4 SPARCS – Navis

9. Pictures:



| Home | Members | Organization Profile | Information Service | Standard | Regulations
| Jobs & Training | Refreshing Pictures | Maritime Terms | Forum | Email