North area
> Quang Ninh Port
> Cam Pha Port
> Hai Phong Port
> Cua Cam Port
> Dinh Vu Port
> Vat Cach Port
> Doan Xa Port
> B12 Oil Terminal Port
> Transvina
> PTSC Dinh Vu Port
> Cai Lan International Container Terminal
> Hai Phong - New Port 128
> Nam Hai Dinh Vu
Central area
> Thanh Hoa Port
> Nghe Tinh Port
> Viet - Lao Vung Ang
> Quang Binh Port
> Cua Viet Port
> Thuan An Port
> Chan May Port
> Da Nang Port
> Nguyen Van Troi Port
> Ky Ha Port
> Ky Ha-Quang Nam Port
> Hai Son Port
> Song Han 9 Port
> Qui Nhon Port
> Nha Trang Port
> Thi Nai Port
> Cam Ranh Port
> Vung Ro Port
> Dzung Quat Port
South area
> Binh Minh Port
> Phu My Port
> Dong Nai Port
> Saigon New Port
> Saigon Port
> Ben Nghe Port
> Binh Duong Port
> Tan Thuan Dong Port
> Rau Qua Port
> Saigon Petro Port
> Nha be Oil Port
> Bong Sen Port
> My Tho Port
> Dong Thap Port
> Vinh Long Port
> Can Tho Port
> Ben Dam-Con Dao VT
> Vung Tau Commercial Port
> Tra Noc - Can Tho
> An Giang Port
>

VICT Port

> Can Tho ship industry and transport
> SP-PSA
>

Interflour Cai Mep

> Cai Mep International Terminal
> Saigon premier container terminal (SPCT)
>

Tan Cang - Cai Mep International Terminal (TCIT)

> PVC-MS
> Cai Mep Oil Terminal
> PV Shipyard
> SITV
> Saigon-Hiep Phuoc
> Long Thanh
> Dong Xuyen
> SP-SSA International Terminal- SSIT
> Phu Dong
> Nam Can
> Bao Mai
 
 
 

CUA CAM
1. Port's name & contact address:


Port's name
: CUA CAM PORT JOINT-STOCK COMPANY
Under: PETROLIMEX
Port's location: 20°52'N - 106°41'E
Pilot boarding position: 20°40'N - 106°51'E
Address: 2 Ngo Quyen street, Ngo Quyen district, Hai Phong city
Tels. No.: (84.31) 3837391   
Fax No.: (84.31) 3837393
E-mail: camporthp1@gmail.com



 Mr. Nguyen Manh Cuong
2. Management:
  
Director
 Mr. Nguyen Manh Cuong
Tel: 84.31.3654072
Vive Director, Operations Mr. Nguyen Canh Thang
3. Access channel:

Length 30 km. Channel depth: -7.0 m. Tidal regime: diurnal. Average tidal range: 2.5 m.
Maximum draft: 7.0 m.
Maximum size of vessel accepted: 5,226 DWT


4. Infrastructure and equipment:
. Berth facilities:

Name/No.

Length

Depth alongside

 Vessel/Cargo

Wharf No.1,2,3

   270 m

 

-4.5 m

 

General cargo

 


. Storage facilities:

Total port area: 30,000 m2
Open storage: 28,000 m2, of which container yard: 11,000 m2. Tank: 1,300 m3. Total capacity: 500.000MT

. Major equipment:

 

Type

No.

Capacity

Jib crane 4
4~16 MT
Rubber-tyred Crane 1 36 MT
Buldozer/excavator 1

0.15m3

5. Cargo throughput:
2010 2011 2012 2013 2014 2015
Total 426,117 MT 395,000 MT 268,456 MT 365,000 MT 420,000 MT 501,000 MT
Import 67,249 MT 0 120,000 MT 13,000 MT 19,000 MT 65,000 MT
Export 70,000 MT 0 0 0 0 4,000 MT
Domestic 288,868 MT 395,000 MT 148,456 MT 352,000 MT 401,000 MT 432,000 MT
Container            
Ship calls 311 341 220 198 239 134
6. Development Plans

Project

Total cost of investment

Implementation

Filling area of 13,000m2

VND 9.5 billion

2013

7. Main services:

  • Cargo handling.
  • Warehousing
  • Maritime service
  • Shipping repair
  • Fresh water and equipment supply.

8. Computer system:

14 PCs applied in management of information and operations.                      

           


 

| Home | Members | Organization Profile | Information Service | Standard | Regulations
| Jobs & Training | Refreshing Pictures | Maritime Terms | Forum | Email