North area
> Quang Ninh Port
> Cam Pha Port
> Hai Phong Port
> Cua Cam Port
> Dinh Vu Port
> Vat Cach Port
> Doan Xa Port
> B12 Oil Terminal Port
> Transvina
> PTSC Dinh Vu Port
> Cai Lan International Container Terminal
> Hai Phong - New Port 128
> Nam Hai Dinh Vu
Central area
> Thanh Hoa Port
> Nghe Tinh Port
> Viet - Lao Vung Ang
> Quang Binh Port
> Cua Viet Port
> Thuan An Port
> Chan May Port
> Da Nang Port
> Nguyen Van Troi Port
> Ky Ha Port
> Ky Ha-Quang Nam Port
> Hai Son Port
> Song Han 9 Port
> Qui Nhon Port
> Nha Trang Port
> Thi Nai Port
> Cam Ranh Port
> Vung Ro Port
> Dzung Quat Port
South area
> Binh Minh Port
> Phu My Port
> Dong Nai Port
> Saigon New Port
> Saigon Port
> Ben Nghe Port
> Binh Duong Port
> Tan Thuan Dong Port
> Rau Qua Port
> Saigon Petro Port
> Nha be Oil Port
> Bong Sen Port
> My Tho Port
> Dong Thap Port
> Vinh Long Port
> Can Tho Port
> Ben Dam-Con Dao VT
> Vung Tau Commercial Port
> Tra Noc - Can Tho
> An Giang Port
>

VICT Port

> Can Tho ship industry and transport
> SP-PSA
>

Interflour Cai Mep

> Cai Mep International Terminal
> Saigon premier container terminal (SPCT)
>

Tan Cang - Cai Mep International Terminal (TCIT)

> PVC-MS
> Cai Mep Oil Terminal
> PV Shipyard
> SITV
> Saigon-Hiep Phuoc
> Long Thanh
> Dong Xuyen
> SP-SSA International Terminal- SSIT
> Phu Dong
> Nam Can
> Bao Mai
 
 
 

DONG NAI PORT
1. Name and Address

Port's name: DONG NAI PORT JOINT-STOCK CO
Under: SONADEZI
Port's location:
- Long Binh Tan Terminal: 10°54'01"N - 106°50'29"E
- Go Dau A Terminal: 10°39'28"N - 107°01'16"E
- Go Dau B Terminal: 10°37'08"N - 107°01'26"E
Pilot boarding position: 10°20'N - 107°02'E
Main office: Long Binh Tan ward, Bien Hoa city, Dong Nai province
Tel: 84.61.3832225/3831439/3543328
Fax: 84.61.3831259
E-mail: dongnaiport@vnn.vn
Website: www.dongnai-port.com


Mr. NGUYEN NGOC TUAN
2. Management
Chairman

Mr. TRAN THANH HAI
Tel: 0613.832.225

General Director Mr. NGUYEN NGOC TUAN
Tel: 0613. 832.225
Deputy G.D. for Engineering & Administration Mr. DO VAN SAM
Tel: 0613. 832.225
Deputy G.D. for Business

Mr. TRAN VAN NGUYEN
Tel: 0613. 832.225

3. Access channel:
  • To Long Binh Tan Terminal situated on the Dong Nai river: length 100 km. Channel depth: 4m. Tidal regime: irregular semi-diurnal. Average tidal range: 3.0 m. Maximum draft: 6.2m.Maximum size of vessel accepted: 5,000 DWT.
  • To Go Dau A and Go Dau B Terminals situated on the Thi Vai river: length 35 km. Channel depth: 6.5m. Tidal regime: irregular semi-diurnal. Average tidal range: 4.6 m. Maximum Draft: 11.1m.

    Maximum size of vessel accepted: at Go Dau A wharf: 10,000DWT vessel and Go Dau B: 15,000DWT vessel).




4. Berths :

 

Name/No.

Length

Depth alongside

Vessel/Cargo

K1 Long Binh Tan

K2 Long Binh Tan

K3 Long Binh Tan

K4 Long Binh Tan

A1 Go Dau

A3 Go Dau

Expanded A3 Go Dau

B1 Go Dau

B2 Go Dau

B3 Go Dau

    60.2 m

    72.0 m

    67.8 m

    14.0 m

    30.0 m

  110.0 m

  110.0 m

    58.0 m

  120.0 m

  105.0 m

-3.3 m

-3.6 m

-7.5 m

-3.0 m

-6.4 m

-9.5 m

     -9.5 m

-5.0 m

  -10.3 m

  -10.0 m

General cargo

ditto
Container
ditto
ditto

ditto

General cargo

ditto

ditto

ditto

5. Storage

Total port area: 817,526 m2 (Long Binh Tan: 82,686 m2, Go Dau A: 167,383 m2, Go Dau B: 224,667 m2). Warehouse/shed: 5,000 m2. Open storage: 168,000 m2. Tank: 3.000 m3
Total storage capacity: 200,000 MT

6. Equipments
Type
No.
Capacity
Shore crane 14 40~100 MT
Laden container lifter 2 45 MT
Empty container lifter 2 8~ 10 MT
Tractor with chassis 10 40 MT
Lift tractor 2 30 MT
7. Cargo throughput:
2009 2010 2011 2012 2013 2014 2015
Total 2,365,992 MT 2,342,738 MT 2,686,706 MT 2,757,563 MT 2,675,714 MT 3,414,849 MT 6,800,000 MT
Import 791,814 MT 847,808 MT 904,905 MT 961,107 MT 661,136 MT 803,735 MT 826,000 MT
Export 529,936 MT 188,193 MT 321,458 MT 247,111 MT 259,906 MT 524,270 MT 537,000 MT
Domestic 1,044,242 MT 1,306,737 MT 1,460,343 MT 1,549,345 MT 1,754,672 MT 2,086,844 MT 2,097,000 MT
Container     3,091 TEUs 117,851 TEUs 194,818 TEUs 255,708 TEUs 141,380 TEUs
Ship calls 741 2,122 1,123 1,577 1,949 1,577 1,703

8. Development plan:

Project

Cost of investment

Implementation

- Expanding Dong Nai Terminal, Phase I

VND 126.8 billion

Being in use and operations

- Expanding Dong Nai Terminal, Phase II

VND 438.5 billion

Expected to be completed  in the end of 2015 for infrastructure items

 

- Expanding Go Dau B Terminal, Phase II

 

VND 318.2 billion

 

Expected to be put into operations in 2016

 

9. Main services:

  • Port facilities operations and management
  • Handling & transportting cargoes in or outside the port area
  • Repairs of handling equipment and transportation means
  • Ship agent and maritime services
  • Supplying fuel to vessels/vehicles: petrol, lubricant,...
  • Taxi transporting sevices
  • Trading construction materials: soil, stones, sand, gravel
  • Duty free shop, seamen's club
  • Surveying, designing and constructing communication works
  • Real estate
  • Trading, and importing wood logs, steels, argriculture products except cotton and cashew.
  • Trading and supplying other products/services  being in compliance with law and regulations.



10. Computer systems:

185 PCs, applied in port operations and management

 

 