North area
> Quang Ninh Port
> Cam Pha Port
> Hai Phong Port
> Cua Cam Port
> Dinh Vu Port
> Vat Cach Port
> Doan Xa Port
> B12 Oil Terminal Port
> Transvina
> PTSC Dinh Vu Port
> Cai Lan International Container Terminal
> Hai Phong - New Port 128
> Nam Hai Dinh Vu
Central area
> Thanh Hoa Port
> Nghe Tinh Port
> Viet - Lao Vung Ang
> Quang Binh Port
> Cua Viet Port
> Thuan An Port
> Chan May Port
> Da Nang Port
> Nguyen Van Troi Port
> Ky Ha Port
> Ky Ha-Quang Nam Port
> Hai Son Port
> Song Han 9 Port
> Qui Nhon Port
> Nha Trang Port
> Thi Nai Port
> Cam Ranh Port
> Vung Ro Port
> Dzung Quat Port
South area
> Binh Minh Port
> Phu My Port
> Dong Nai Port
> Saigon New Port
> Saigon Port
> Ben Nghe Port
> Binh Duong Port
> Tan Thuan Dong Port
> Rau Qua Port
> Saigon Petro Port
> Nha be Oil Port
> Bong Sen Port
> My Tho Port
> Dong Thap Port
> Vinh Long Port
> Can Tho Port
> Ben Dam-Con Dao VT
> Vung Tau Commercial Port
> Tra Noc - Can Tho
> An Giang Port
>

VICT Port

> Can Tho ship industry and transport
> SP-PSA
>

Interflour Cai Mep

> Cai Mep International Terminal
> Saigon premier container terminal (SPCT)
>

Tan Cang - Cai Mep International Terminal (TCIT)

> PVC-MS
> Cai Mep Oil Terminal
> PV Shipyard
> SITV
> Saigon-Hiep Phuoc
> Long Thanh
> Dong Xuyen
> SP-SSA International Terminal- SSIT
> Phu Dong
> Nam Can
> Bao Mai
 
 
 

KY HA - QUANG NAM PORT
1. Port's name & contact address:


Port's name: BRANCH OF KY HA CHU LAI QUANG NAM INVESTMENT AND DEVELOPMENT COMPANY LIMITED – KY HA PORT ENTERPRISE
Under: The People’s Committee of Quang Nam Province
Port's location: 15°28'44"N - 108°41'03.5E
Pilot boarding position: 15°29'5"N - 108°41'7"E
Address: Tam Quang commune, Nui Thanh district, Quang Nam province
Tel.: (84.510) 3550777 - 3550108       
Fax: (84.510) 550108 / 872787                  
E-mail: kyhaport@dng.vnn.vn; kyhaport@gmail.com


2. Management:

Director
Mr. Vo Phuoc Long
Tel: (84) 913.499675
Vice Director Mr. Ninh Van Tri
Tel: (84) 982.776777
3. Access channel:

- Length: 5 km.
- Channel depth: -7.0 m.
- Tidal regime: semi-diurnal.
- Average tidal range: 1.2 m.
- Maximum draft: -7.8 m
- Maximum size of vessel accepted: 12,000 DWT
4. Infrastructure and equipment:
. Berth facilities:

Name/No.

Length

Depth alongside
Vessel/Cargo
 
Wharf No.2
160 m
-8.2 m
General cargo
. Storage facilities:

Total port area: 45,000 m2, of which:
Warehouse/shed: 3,000 m2. Open storage: 15,000 m2,

. Major equipment:

Type

No.

Capacity

Shore crane 7
20 ~ 80 MT
Forklift 3
3~4.5  MT
Tractor 7
30~70 MT
Tug boat 1
530HP
Scale bridge 1
60 MT
Grab 4
1~2 M3
Excavator 3 2.5 M3
5. Cargo throughput
2009 2010 2011 2012 2013 2014 2015
Total 40,000 MT 594,000 MT 680,000 MT 465,000 MT 302,000 MT 205,700 MT  
Import   55,000 MT 34,000 MT 6,000 MT 2,240 MT 666 MT  
Export   163,000 MT 210,000 MT 80,500 MT 5,200 MT 0T  
Domestic 40,000 MT 376,000 MT 436,000 MT 378,500 MT 294,560 MT 205,034 MT  
Container 10,000 TEUs 24,774 TEUs 28,041 TEUs 8,094 TEUs 176 TEUs 436 TEUs  
Ship calls 200 256 249 208 190 126  
6. Development Plans


Project/Planning

Total cost of investment

Implementation

Upgrading the wharf

 

VND 400 bilion

2013

7. Main services:

  • Cargo handling.
  • Warehouse leasing
  • Tug boat service
  • Freshwater supply

8. Computer system:

12 high-configuration PCs installed with dedicated softwares

 

 