CAM PHA PORT |
1.
Port's name & contact address: |
Port's name: Cam Pha Port & Logistics Company
Under:
Vietnam National Coal-Mineral Industries Group, "VINACOMIN" Port's location:
21°01'30"N - 107°22'00"E Pilot boarding
position: 20°43' 04"N - 107°10' 03"E
Address: Ly Thuong Kiet street, Cua Ong
ward, Cam Pha town, Quang Ninh province
Tels. No.: 84.33.3865045
Fax No.: 84.33.3865320
Email: pmson@camphaport.com.vn
Website: http://www.camphaport.com.vn |
Mr. BUI VAN TUAN |
2. Management |
Director |
Mr. Bui Van Tuan
Tel: (84.33) 3865271 |
Vice Director |
Mr.
Nguyen Ba Bon
Tel: (84.33)
3730359 |
Vice Director |
Mr. Nguyen Van Chang
Tel: (84.33)
3731722 |
Vice Director |
Mr.
Pham Van Hoan
Tel: (84.33) 3734488 |
Vice Director |
Mr.Bui dinh Trung
Tel: (84.33) 3734728 |
|
3.
Access channel:
- Lenght: 40 km. Channel depth: -7.4~-11
m.
- Tidal regime: regular diurnal.
- Average tidal range: 4.0 m.
- Maximum draft: -9.5m ~ -13.5m.
- Maximum size of vessel accepted: 76,000 GRT
|
4. Infrastructure
and equipment: |
.Berth facilities:
Tên/Số hiệu (Name/No.) |
Dài (Length) |
Depth alongside |
Vessel/Cargo |
Wharf No.1
Wharf No.2
Wharf No.3 |
300 m
250 m
100 m |
-9.0 m
-10.5 m
-4.5 m |
Bulk carrier/Coal
Bulk carrier/Coal
Package/ others
|
|
. Storage facilities:
Total area: 200,000 m2, of which:
Warehouse/shed: Open storage: 200,000 m2.
Total storagecapacity: 600,000 MT
. Major equuipment: |
Type |
No. |
Capacity |
Shiploader |
2 |
250 MT/tph-each |
Conveyer system |
2 |
800 /tph-each |
Conveyer system |
1 |
|
Dozer/Trimmer |
3 |
|
Tugboat |
4 |
5,000 HP in total output |
Floating crane |
7 |
5~30 MT |
Barge |
28 |
60,200 MT capacity in total |
|
5. Cargo throughput: |
|
2010 |
2011 |
2012 |
2013 |
2014 |
2015 |
Total |
21,230.586 MT than |
20,714,124 MT |
18,000,000 MT |
15,783,000 MT |
7,600,302 MT |
8,547,374 MT |
Export |
17,174,163 MT. |
16,380,612 MT |
250,000 MT |
6,724,000 MT |
2,112,618 MT |
646,479 MT |
Import |
330,000 MT |
1,400 MT |
7,044,000 MT |
0 |
0 |
0 |
Domestic |
3,726,423 MT. |
4,332,112 MT. |
10,706,000 MT |
9,059,000 MT |
5,487,684 MT |
7,900,895 MT |
Ship calls |
4,300 |
1,700 |
1,340 |
1,178 |
820 |
1200 |
|
|
6. Development
Plans |
Project |
Total
cost of investment |
Implementation |
|
|
7. Main services:
Coal handling and transporting. . Managing and operating ports and access channels. Tug assistance and marine salvage. Import/export of cargo. Shipchandler, tourism and maritim services, handling others cargoes out of coal
|
8. Computer system:
150 including 2 servers, size up to Pentium IV, applied in operations and management
|
|