1. Port's name & contact address: |
|
CAI CUI PORT
Port's name: CAI CUI PORT
Under: Vietnam National Shipping Lines
Port's location: 09°59'6.28"N - 105°50'7.98"E
Pilot boarding position: 09°30'23"2N - 106°30'26"E
Address: No.02 Phu Thang zone, Tan Phu ward, Cai Rang district, Can Tho City
Phone: (84.710) 3917393 - 3917395
Fax (Fax): (84.710) 3917394
E-mail: ccc@caicuiport.vn; caicuiport@gmail.com
Website : www.caicuiport.vn |
Mr Lam Tien Dung |
|
|
|
|
|
2. Management: |
|
Director |
Mr Lam Tien Dung
Tel: (84.710) 3917395 |
Vice Director, Operations |
Mr
Nguyen Van Ba
Tel: (84.710) 3917393 |
Vice Director, Economics |
Mr
To Nhat Thong
Tel: (84.710) 3242987 |
|
|
|
|
|
3. Access channel: |
|
|
Length: 55 nautical miles.
Channel depth: 4.2m.
Tidal regime: semi-diurnal.
Average tidal range: 3.0 m.
Maximum draft: -7.0 m.
Maximum size of vessel accepted: 20,000 DWT.
|
|
|
|
|
4. Berth facilities: |
|
Name/No. |
Length |
Depth alongside |
Vessel/Cargo |
Wharf No.1
Wharf No.2
Wharf No.3
Wharf No.4 |
165 m
200 m
150 m
150 m |
12~14m
12~14m
12~14m
12~14m |
General cargo, container
-nt- (-ditto-)
-nt- (-ditto-)
-nt- (-ditto-)
|
|
|
|
|
|
5. Storage facilities: |
|
|
Total port area: 39,924 m2
Warehouse/shed: 3,024 m2.
Open storage: 36,900 m2, (of which container yard: 26,700 m2). |
|
|
|
|
6. Major equuipment: |
|
Type |
No. |
Capacity |
Floating crane |
4 |
45~60 MT |
Crawler crane |
6 |
50~100 MT |
Reach stacker |
1 |
45 MT |
Forklift |
4 |
2.5~42 MT |
Container mover |
10 |
|
Bulldozer |
4 |
|
Dump truck |
10 |
8~15 MT |
Truck |
10 |
|
|
|
|
|
|
7. Cargo throughput: |
|
|
2007 |
2008 |
2009 |
2010 |
2011 |
2012 |
Total |
534,116 MT |
2,553,775 MT |
4,340,000 MT |
450,145 MT |
517,701 MT |
502,495 MT |
Import |
0 MT |
2,772MT |
0 |
0 |
0 |
0 |
Export |
387,149 MT |
2,358,991 MT |
4,266,190 MT |
116,816 MT |
109,591 MT |
47,374 MT |
Domestic |
146,967 MT |
192,012 MT |
73,810 MT |
333,329 MT |
408,110 MT |
455,121 MT |
Container |
|
|
|
|
2,330 TEUs |
2,330 TEUs |
Ship calls |
102 |
324 |
494 |
160 |
242 |
572 |
|
|
|
|
|
8. Development plan: |
|
|
Dự án (Project) |
Tổng kinh phí đầu tư
(Total cost of investment) |
Kế hoạch thực hiện (Implenmentation) |
Đầu tư xây dựng GĐ II (Investment for construction of Phase II).
|
210 tỷ Đồng
(VND 210 billion) |
2009 – 2012.
Hoàn thành cầu tàu số 2; dang thi công gói thầu số 5 – kho bãi, đường nội bộ (Wharf No.2 completed; tender package No.5 is being under construction – items of warehouse and inter road |
|
|
9. Main services: |
|
|
Stevedoring, tallying and delivery of cargoes. On-land and by-waterways transport. Warehouse, open storage, office leasing. Supply of other maritime services. Supply services for vessel, international and national customers such service as petroleum supply, other maritime services
|
|
|
|
|
9. Computer systems: |
|
|
40 PCs being applied in port operations and management |
|
|
|
|
|